4.9

Yn dangos sylwadau a ffurflenni 1 i 7 o 7

Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27158

Derbyniwyd: 22/12/2017

Ymatebydd: Home Builders Federation Ltd

Crynodeb o'r Gynrychiolaeth:

HBF objects to the statement that the 'LDP target was unrealistic'.
HBF objects to the statement 'This issue was exacerbated in 2015 by changes to TAN1'.

Testun llawn:

The HBF does not agree with the statement that the 'LDP target was unrealistic'. At the time it was based on the information available and went through scrutiny at the plans inquiry and was adopted by the Council. Although circumstances and the data available may now have changed, at the time it was the appropriate target.
The HBF object to the statement 'This issue was exacerbated in 2015 by changes to TAN1'. The method of calculation does not directly affect the land supply as the wording suggests. TAN1 is purely a method by which to monitor the land available. One of the reason TAN1 was changed was that WG realised that relying on past build rates gave a false land supply figure and merely allowed Councils to continue to fail in the supply of new homes. An LDP should be about planning for the future needs and demands of the area as well as taking account of economic and other aspirations. A plan based on past records would be to plan for continued failure.


Ein hymateb:

Accepted in part. Whilst we acknowledge that the housing target was found sound at Examination, subsequent WG projections have indicated far lower housing requirements. The Inspector did not take into account the reduced level of delivery since 2008, although CCBC argued to reduce the requirement for this reason.
PPW does now change the emphasis to be given to WG household projections when calculating LDP household requirements than was the case PPW prior to Edition 8. This will be clarified.

Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27209

Derbyniwyd: 22/12/2017

Ymatebydd: Anwyl Construction Ltd

Asiant : P L Planning

Crynodeb o'r Gynrychiolaeth:

The LDP housing target was not unrealistic. It was evidence based, consulted upon at Deposit, Examined and found to be Sound. This should be explicitly acknowledged.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Accepted in part. Whilst we acknowledge that the housing target was found sound at Examination, subsequent WG projections have indicated far lower housing requirements. The Inspector did not take into account the reduced level of delivery since 2008, although CCBC argued to reduce the requirement for this reason.

Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27210

Derbyniwyd: 22/12/2017

Ymatebydd: Anwyl Construction Ltd

Asiant : P L Planning

Crynodeb o'r Gynrychiolaeth:

The revision to TAN1 (2015) has not exacerbated the housing land supply position. It provided a standardised method of calculating housing land supply. The consequence is that Local Authorities cannot not use alternative methods of calculation (such as previous build rates) to rely on past performance a measure of success nor to continue to set aside their responsibilities to plan for the delivery of housing in accordance with National Planning Policy.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Noted. It is acknowledged that the residual method has always been the primary method of calculating land supply for authorities with adopted plans, however the past build rates method provided a 'sense-check' of the residual requirement which may indicate 'land shortages or surpluses, which do not exist in practice' (TAN1 2006 7.5.2)

Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27227

Derbyniwyd: 22/12/2017

Ymatebydd: Beech Developments (NW) Ltd

Asiant : P L Planning

Crynodeb o'r Gynrychiolaeth:

The LDP housing target was not unrealistic. It was evidence based, consulted upon at Deposit, Examined and found to be Sound. This should be explicitly acknowledged.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Accepted in part. Whilst we acknowledge that the housing target was found sound at Examination, subsequent WG projections have indicated far lower housing requirements. The Inspector did not take into account the reduced level of delivery since 2008, although CCBC argued to reduce the requirement for this reason.

Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27228

Derbyniwyd: 22/12/2017

Ymatebydd: Beech Developments (NW) Ltd

Asiant : P L Planning

Crynodeb o'r Gynrychiolaeth:

The revision to TAN1 (2015) has not exacerbated the housing land supply position. It provided a standardised method of calculating housing land supply. The consequence is that Local Authorities cannot not use alternative methods of calculation (such as previous build rates) to rely on past performance a measure of success nor to continue to set aside their responsibilities to plan for the delivery of housing in accordance with National Planning Policy.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Noted. It is acknowledged that the residual method has always been the primary method of calculating land supply for authorities with adopted plans, however the past build rates method provided a 'sense-check' of the residual requirement which may indicate 'land shortages or surpluses, which do not exist in practice' (TAN1 2006 7.5.2)

Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27245

Derbyniwyd: 22/12/2017

Ymatebydd: Macbryde Homes Ltd

Asiant : P L Planning

Crynodeb o'r Gynrychiolaeth:

The LDP housing target was not unrealistic. It was evidence based, consulted upon at Deposit, Examined and found to be Sound. This should be explicitly acknowledged.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Accepted in part. Whilst we acknowledge that the housing target was found sound at Examination, subsequent WG projections have indicated far lower housing requirements. The Inspector did not take into account the reduced level of delivery since 2008, although CCBC argued to reduce the requirement for this reason.

Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27246

Derbyniwyd: 22/12/2017

Ymatebydd: Macbryde Homes Ltd

Asiant : P L Planning

Crynodeb o'r Gynrychiolaeth:

The revision to TAN1 (2015) has not exacerbated the housing land supply position. It provided a standardised method of calculating housing land supply. The consequence is that Local Authorities cannot not use alternative methods of calculation (such as previous build rates) to rely on past performance a measure of success nor to continue to set aside their responsibilities to plan for the delivery of housing in accordance with National Planning Policy.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Noted. It is acknowledged that the residual method has always been the primary method of calculating land supply for authorities with adopted plans, however the past build rates method provided a 'sense-check' of the residual requirement which may indicate 'land shortages or surpluses, which do not exist in practice' (TAN1 2006 7.5.2)