Gwrthwynebu

Adroddiad Adolygu

ID sylw: 27246

Derbyniwyd: 22/12/2017

Ymatebydd: Macbryde Homes Ltd

Asiant : P L Planning

Crynodeb o'r Gynrychiolaeth:

The revision to TAN1 (2015) has not exacerbated the housing land supply position. It provided a standardised method of calculating housing land supply. The consequence is that Local Authorities cannot not use alternative methods of calculation (such as previous build rates) to rely on past performance a measure of success nor to continue to set aside their responsibilities to plan for the delivery of housing in accordance with National Planning Policy.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Noted. It is acknowledged that the residual method has always been the primary method of calculating land supply for authorities with adopted plans, however the past build rates method provided a 'sense-check' of the residual requirement which may indicate 'land shortages or surpluses, which do not exist in practice' (TAN1 2006 7.5.2)