ID sylw: 27212
Derbyniwyd: 22/12/2017
Ymatebydd: Anwyl Construction Ltd
Asiant : P L Planning
There is no mention of the suitability of sites allocated for housing in the plan or indeed their potential to become available. For example there has been subsequent research on the need to look at deliverability and viability far more closely than in previously LDPs (WG study 'Longitudinal Viability Study of the Planning Process').
Furthermore case studies (including in Conwy) suggest permissions not being released as a result of delays in signing S106 agreements.
See attached document.
Accepted. As part of the LDP review, candidate sites will be required to demonstrate viability and deliverability before being allocated. The conclusion will be expanded to reflect this.