4.4
Gwrthwynebu
Adroddiad Adolygu
ID sylw: 27171
Derbyniwyd: 22/12/2017
Ymatebydd: Home Builders Federation Ltd
The current commentary on windfall sites is one sides and does not include a number of the factors that could have an effect on the level of windfall development.
The HBF do not consider that this paragraph on windfall's currently provides all sides of the story. There are many factors which could affect the level of windfall development, firstly the windfall level could have been set at an unrealistic level so was never going to be achieved. Secondly by their nature there is not an unlimited supply of windfall sites and no guarantee of when they will come forward so their availability is likely to reduce over time, both of these points should be included within the paragraph. Further if it is just down to small sites as explained in the paragraph it would help to provide some data to support this.
Noted. All housing requirements and sources of supply will be re-assessed as part of the LDP Review process.
Gwrthwynebu
Adroddiad Adolygu
ID sylw: 27208
Derbyniwyd: 22/12/2017
Ymatebydd: Anwyl Construction Ltd
Asiant : P L Planning
Failure to deliver the envisaged number of windfalls: The windfall allowance was calculated by using a 5 year past trend and doubling it. As the Inspector reported (para 5.35) "simply doubling this figure by way of extrapolation to 2022 introduces a greater degree of uncertainty...". The Plan also relies on a high percentage of windfalls (29%) coming forward. The risk of failure from windfall not being achieved was therefore reasonably predictable.
See attached document.
Noted. All housing requirements and sources of supply will be re-assessed as part of the LDP Review process.
Gwrthwynebu
Adroddiad Adolygu
ID sylw: 27226
Derbyniwyd: 22/12/2017
Ymatebydd: Beech Developments (NW) Ltd
Asiant : P L Planning
Failure to deliver the envisaged number of windfalls: The windfall allowance was calculated by using a 5 year past trend and doubling it. As the Inspector reported (para 5.35) "simply doubling this figure by way of extrapolation to 2022 introduces a greater degree of uncertainty...". The Plan also relies on a high percentage of windfalls (29%) coming forward. The risk of failure from windfall not being achieved was therefore reasonably predictable.
See attached document.
Noted. All housing requirements and sources of supply will be re-assessed as part of the LDP Review process.
Gwrthwynebu
Adroddiad Adolygu
ID sylw: 27244
Derbyniwyd: 22/12/2017
Ymatebydd: Macbryde Homes Ltd
Asiant : P L Planning
Failure to deliver the envisaged number of windfalls: The windfall allowance was calculated by using a 5 year past trend and doubling it. As the Inspector reported (para 5.35) "simply doubling this figure by way of extrapolation to 2022 introduces a greater degree of uncertainty...". The Plan also relies on a high percentage of windfalls (29%) coming forward. The risk of failure from windfall not being achieved was therefore reasonably predictable.
See attached document.
Noted. All housing requirements and sources of supply will be re-assessed as part of the LDP Review process.