Strategaeth a Ffefrir
Chwilio sylwadau
Canlyniadau chwilio Conwy County Borough Council
Chwilio o’r newyddCefnogi
Strategaeth a Ffefrir
4.3.31
ID sylw: 27430
Derbyniwyd: 05/08/2019
Ymatebydd: Conwy County Borough Council
It is vital that we have a preferred site(I understand this is ERF site in Mochdre) and a contingency site for the transit Gypsy/Traveller Site. Previous experience suggests that if we do not have a contingency site there is a high risk of the preferred site failing and no option in the period of the LDP for a site to be built. Opponents of sites will welcome no contingency site being in the LDP. Hence the importance of both a preferred site and contingency site.
It is vital that we have a preferred site(I understand this is ERF site in Mochdre) and a contingency site for the transit Gypsy/Traveller Site. Previous experience suggests that if we do not have a contingency site there is a high risk of the preferred site failing and no option in the period of the LDP for a site to be built. Opponents of sites will welcome no contingency site being in the LDP. Hence the importance of both a preferred site and contingency site.
A G&T Transit Site to meet GTAA requirements will be allocated in the Deposit Plan. The provision of a contingency site is not required under WG guidance.
Cefnogi
Strategaeth a Ffefrir
4.2.2
ID sylw: 27431
Derbyniwyd: 05/08/2019
Ymatebydd: Conwy County Borough Council
It is vital that there is some detailed information about the Transport Management provision for Abergele in the LDP. There is a high risk that if no contingencies are provided the present provision will not be sustainable for the whole of the LDP period. Like other residents I want to understand what the detailed options are?
It is vital that there is some detailed information about the Transport Management provision for Abergele in the LDP. There is a high risk that if no contingencies are provided the present provision will not be sustainable for the whole of the LDP period. Like other residents I want to understand what the detailed options are?
CCBC are continuing with the highway capacity options for Abergele town centre.