Preferred Strategy

Search representations

Results for Conwy County Borough Council search

New search New search

Support

Preferred Strategy

4.3.31

Representation ID: 27430

Received: 05/08/2019

Respondent: Conwy County Borough Council

Representation Summary:

It is vital that we have a preferred site(I understand this is ERF site in Mochdre) and a contingency site for the transit Gypsy/Traveller Site. Previous experience suggests that if we do not have a contingency site there is a high risk of the preferred site failing and no option in the period of the LDP for a site to be built. Opponents of sites will welcome no contingency site being in the LDP. Hence the importance of both a preferred site and contingency site.

Full text:

It is vital that we have a preferred site(I understand this is ERF site in Mochdre) and a contingency site for the transit Gypsy/Traveller Site. Previous experience suggests that if we do not have a contingency site there is a high risk of the preferred site failing and no option in the period of the LDP for a site to be built. Opponents of sites will welcome no contingency site being in the LDP. Hence the importance of both a preferred site and contingency site.


Our response:

A G&T Transit Site to meet GTAA requirements will be allocated in the Deposit Plan. The provision of a contingency site is not required under WG guidance.

Support

Preferred Strategy

4.2.2

Representation ID: 27431

Received: 05/08/2019

Respondent: Conwy County Borough Council

Representation Summary:

It is vital that there is some detailed information about the Transport Management provision for Abergele in the LDP. There is a high risk that if no contingencies are provided the present provision will not be sustainable for the whole of the LDP period. Like other residents I want to understand what the detailed options are?

Full text:

It is vital that there is some detailed information about the Transport Management provision for Abergele in the LDP. There is a high risk that if no contingencies are provided the present provision will not be sustainable for the whole of the LDP period. Like other residents I want to understand what the detailed options are?


Our response:

CCBC are continuing with the highway capacity options for Abergele town centre.