
51 Tir yn Nhroed y Bwlch, Deganwy
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27469
Derbyniwyd: 19/08/2019
Ymatebydd: Georgina Taylor
Pentywyn road is already too busy with traffic.
We are losing too much of the countryside to housing. The dog walkers in the area already leave too much dog waste along the walking paths. The road is already too busy with traffic.
Pentywyn road is already too busy with traffic.
noted, already ruled out at Stage 1 of the assessment.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27483
Derbyniwyd: 19/08/2019
Ymatebydd: Mr John Taylor
No Access, single track un-adopted road
Land is prone to flooding. Trees should be planted to resolve this problem and land left for bird life and nature.
No Access, single track un-adopted road
noted, already ruled out at Stage 1 of the assessment.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27749
Derbyniwyd: 17/09/2019
Ymatebydd: Mr Keith Richards
More green field sites up for destruction.... totally unsuitable. Can't believe you are serious. Would turn road junction at top of Marl Lane into a major crossroads.... already due to become worse with the 110 Beech houses at the top of Marl.
Don't do it.....
More green field sites up for destruction.... totally unsuitable. Can't believe you are serious. Would turn road junction at top of Marl Lane into a major crossroads.... already due to become worse with the 110 Beech houses at the top of Marl.
noted, already ruled out at Stage 1 of the assessment.