51 Land at Troed y Bwlch, Deganwy

Showing comments and forms 1 to 3 of 3

Object

Candidate Site Register

Representation ID: 27469

Received: 19/08/2019

Respondent: Georgina Taylor

Representation Summary:

Pentywyn road is already too busy with traffic.

Change suggested by respondent:

We are losing too much of the countryside to housing. The dog walkers in the area already leave too much dog waste along the walking paths. The road is already too busy with traffic.

Full text:

Pentywyn road is already too busy with traffic.


Our response:

noted, already ruled out at Stage 1 of the assessment.

Object

Candidate Site Register

Representation ID: 27483

Received: 19/08/2019

Respondent: Mr John Taylor

Representation Summary:

No Access, single track un-adopted road

Change suggested by respondent:

Land is prone to flooding. Trees should be planted to resolve this problem and land left for bird life and nature.

Full text:

No Access, single track un-adopted road


Our response:

noted, already ruled out at Stage 1 of the assessment.

Object

Candidate Site Register

Representation ID: 27749

Received: 17/09/2019

Respondent: Mr Keith Richards

Representation Summary:

More green field sites up for destruction.... totally unsuitable. Can't believe you are serious. Would turn road junction at top of Marl Lane into a major crossroads.... already due to become worse with the 110 Beech houses at the top of Marl.

Change suggested by respondent:

Don't do it.....

Full text:

More green field sites up for destruction.... totally unsuitable. Can't believe you are serious. Would turn road junction at top of Marl Lane into a major crossroads.... already due to become worse with the 110 Beech houses at the top of Marl.


Our response:

noted, already ruled out at Stage 1 of the assessment.