
4.2.26
Yn dangos sylwadau a ffurflenni 1 i 1 o 1
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 27730
Derbyniwyd: 02/08/2019
Ymatebydd: Cllr A Wood
Crynodeb o'r Gynrychiolaeth:
TRAFFIC MANAGEMENT
Possible two way system based on Peel Street.
From A55 J24 a strategic network road link to Pensarn. This is already in the RLDP and needs to remain.
From A55 J24 a strategic network road link to Abergele Hospital, by-passing and taking in the link to the new school, and mixed industrial area incorporating the North Wales Growth bid area and infill housing, and possible retail park.
A comprehensive review of the roads and congestion within the town to see what we can alleviate in the meantime.
Testun llawn:
See attached document.
Ein hymateb:
CCBC are continuing with the highway capacity options for Abergele town centre.