Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27685

Derbyniwyd: 12/09/2019

Ymatebydd: Ms wendy orsmond

Crynodeb o'r Gynrychiolaeth:

This site was previously rejected due to access issues the access road is a narrow cul-de-sac with 2 sharp bends and has an increased number of parked vehicles.
Due the high volume of traffic this proposed site would only add to the problems of obstruction for emergency vehicles,residents and pollution.
The council need to take into account the schooling of the new residents children as Ysgol Pen y Bryn is already over subscribed .
This site may impact negatively with problems of flooding the drainage during heavy rainfall is inadequate around the old High way hardly cope at the moment.

Newid wedi’i awgrymu gan ymatebydd:

I request the removal of site (5) from the RDLP.
This site will have serious negative impact on the local residents and flooding issues in Colwyn Bay.
Priority should be made to sites that are better situated and are brownfield sites.

Testun llawn:

This site was previously rejected due to access issues the access road is a narrow cul-de-sac with 2 sharp bends and has an increased number of parked vehicles.
Due the high volume of traffic this proposed site would only add to the problems of obstruction for emergency vehicles,residents and pollution.
The council need to take into account the schooling of the new residents children as Ysgol Pen y Bryn is already over subscribed .
This site may impact negatively with problems of flooding the drainage during heavy rainfall is inadequate around the old High way hardly cope at the moment.


Ein hymateb:

Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.