Object

Preferred Strategy

Representation ID: 28393

Received: 20/09/2019

Respondent: Mr Peter Watton

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28394

Received: 20/09/2019

Respondent: Mr John Dennison

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28395

Received: 20/09/2019

Respondent: Ms Sarah Dennison

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28396

Received: 20/09/2019

Respondent: Mr Alastair Jones

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28397

Received: 20/09/2019

Respondent: Ms Angela Jones

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28398

Received: 20/09/2019

Respondent: Mr Stephen Jones

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28399

Received: 20/09/2019

Respondent: Mr Roger Kenneth Latham

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28400

Received: 20/09/2019

Respondent: Mrs Vivienne Khattak

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28401

Received: 20/09/2019

Respondent: Dr A S Khattak

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28402

Received: 20/09/2019

Respondent: Mr Ian Crawford

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28403

Received: 20/09/2019

Respondent: Mr David G Jenkins

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28404

Received: 20/09/2019

Respondent: Ms Sarah L Jenkins

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28405

Received: 20/09/2019

Respondent: Ms Mavis N Taylor

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28406

Received: 20/09/2019

Respondent: B Proud

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28407

Received: 20/09/2019

Respondent: Ms Hilary Spinks

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28408

Received: 20/09/2019

Respondent: Mr Derek Spinks

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28409

Received: 20/09/2019

Respondent: Ms Katie Stone

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28410

Received: 20/09/2019

Respondent: Ms Elaine Heywood

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28411

Received: 20/09/2019

Respondent: P Downes

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28412

Received: 20/09/2019

Respondent: Ms Lynda Cridge

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28413

Received: 20/09/2019

Respondent: Mr Iolo Roberts

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28414

Received: 20/09/2019

Respondent: Mr Roberts Busby

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28415

Received: 20/09/2019

Respondent: Ms Susan Busby

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28416

Received: 20/09/2019

Respondent: G Marfell

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28417

Received: 20/09/2019

Respondent: Mr Gareth John

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28418

Received: 20/09/2019

Respondent: Mr Greg Lewis

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28419

Received: 20/09/2019

Respondent: Ms Helen Lewis

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28420

Received: 20/09/2019

Respondent: Mr Mark Rogers

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28421

Received: 20/09/2019

Respondent: Mr Kieran L Cassidy

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28422

Received: 20/09/2019

Respondent: Ms Gillian Cassidy

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.