10.2 Llanrhos

Showing comments and forms 121 to 150 of 966

Object

Preferred Strategy

Representation ID: 28363

Received: 20/09/2019

Respondent: Mr Stuart Marson

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28364

Received: 20/09/2019

Respondent: G Griffiths

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28365

Received: 20/09/2019

Respondent: Ms Eileen Lewis

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28366

Received: 20/09/2019

Respondent: Mr John Lewis

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28367

Received: 20/09/2019

Respondent: J Webster

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28368

Received: 20/09/2019

Respondent: Mr Leonard Atkinson

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28369

Received: 20/09/2019

Respondent: Ms Marjorie Atkinson

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28370

Received: 20/09/2019

Respondent: Ms Louise Andrews

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28371

Received: 20/09/2019

Respondent: Ms Shirley Browning

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28372

Received: 20/09/2019

Respondent: W G Honeyman

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28373

Received: 20/09/2019

Respondent: Mr James George Hobson

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28374

Received: 20/09/2019

Respondent: G Manning

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28375

Received: 20/09/2019

Respondent: Ms Alexandra Mary Pimlott

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28376

Received: 20/09/2019

Respondent: Mrs Sheila Payne

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28377

Received: 20/09/2019

Respondent: Mr John A Gauge

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28378

Received: 20/09/2019

Respondent: Ms Ann Roberts

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28379

Received: 20/09/2019

Respondent: Mrs Denise Flacks

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28380

Received: 20/09/2019

Respondent: Mrs Jane Griffiths

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28381

Received: 20/09/2019

Respondent: Ms Ruth Redwood

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28382

Received: 20/09/2019

Respondent: Ms Sylvia Jones

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28383

Received: 20/09/2019

Respondent: Mr Thomas Gwynfor Jones

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28384

Received: 20/09/2019

Respondent: Mr Gwyndaf James

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28385

Received: 20/09/2019

Respondent: Mr/Mrs J M***as

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28386

Received: 20/09/2019

Respondent: J Whiteley

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28387

Received: 20/09/2019

Respondent: Mr Ieuan Michael Morgan

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28388

Received: 20/09/2019

Respondent: Ms Heather L Morgan

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28389

Received: 20/09/2019

Respondent: Ms Roshni Verghese

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28390

Received: 20/09/2019

Respondent: Ms Christine Davies

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28391

Received: 20/09/2019

Respondent: Ms Annie Clegg

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.

Object

Preferred Strategy

Representation ID: 28392

Received: 20/09/2019

Respondent: Mr Roger Stevens

Representation Summary:

The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.