Comment

Preferred Strategy

Representation ID: 28226

Received: 01/10/2019

Respondent: CCBC

Representation Summary:

Kinmel Bay and Towyn has a number of brown field sites which I have no doubt in the future may well be suitable for development which are in close proximity to both the River Gele and the Ffynnon a Dol, but are also close to the infrastructure, utilities and services such developments would need.

These sites must be give priority over green field sites especially those external of the towns boundary, to help with the regeneration and ultimately long term suitability of the Town.

Full text:

See attached document.

Attachments:


Our response:

Noted. Areas of flood risk will be avoided in line with national guidance.