162 Fferm Bryn Rhodyn, Hen Golwyn
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27551
Derbyniwyd: 31/08/2019
Respondent ID: 6401
Ymatebydd: Mr Doug Scott
No building should be permitted in this area as existing roads are already saturated due to building which has taken place. Doctors surgeries are also oversubscribed.
Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27623
Derbyniwyd: 05/09/2019
Respondent ID: 6434
Ymatebydd: Mr Huw Owen
An extension of Bryn y Mor. Development of Dolwen Rd has reached capacity. Is this land agricultural ? Road infrastructure cannot cope. Poor accesss. Usual arguments concerning our local services apply. Sparse public transport.
Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27722
Derbyniwyd: 16/09/2019
Respondent ID: 6554
Ymatebydd: Miss Jo Hughes
The development would
Increase traffic on Llanelian Rd and Dolwen Rd these roads are too narrow with a limited pavement along Dolwen Rd. There is insufficient parking at Colwyn Bay football ground and during home games football supporters park on both sides of the road reducing this to a single line of traffic.
Place a burden on services, schools are facing funding cuts and Betsi Cadwaladr is struggling to recruit GPs to area.
Increase traffic on the marine roundabout
Impact local wildlife - hedge rows and green open spaces.
Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27780
Derbyniwyd: 17/09/2019
Respondent ID: 6552
Ymatebydd: Mrs June Ryan
The land is outside of the settlement boundary and in open countryside. There will be an adverse effect on wild life, with the destruction of hedgerows and trees. There is already an acute lack of amenity space in Colwyn. The infrastructure is already overstretched the Dolwyn Road cannot sustain anymore traffic. Old Colwyn is already over developed.
Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27816
Derbyniwyd: 18/09/2019
Respondent ID: 6574
Ymatebydd: Mr George Ryan
Inadequate infrastructure .
Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27852
Derbyniwyd: 18/09/2019
Respondent ID: 6555
Ymatebydd: Mr David Perry
A development of this size will significantly increase the volume of vehicles using Llanelian Road and negatively impact on the already congested Marine roundabout. Other routes, Coed Coch Road, Peulwys Lane, both currently bus routes, are severely congested by parked vehicles. The T junction between Peulwys Lane and Llanelian Road is already hazardous.
Pupils walking to the various schools in the immediate vicinity need to cross these already busy traffic routes and will be exposed to more risk.
The proposal will lead to further degradation of Doctor's services.
The difficulties presented by this site will disproportionately impact on Old Colwyn.
Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27860
Derbyniwyd: 18/09/2019
Respondent ID: 6606
Ymatebydd: Judith Griffith
Gwrthwynebaf adeiladu ar y safle yma oherwydd yr effaith ar ein iaith a'n diwylliant; yr effaith ar ein lonydd; yr effaith ar ein cefn gwlad a'r effaith ar ein hysgolion a'r meddygfa yma.
Nodwyd. Mae safleoedd ymgeisiol fel hwn wrthi'n cael eu hasesu i weld a ydynt yn addas i'w cynnwys yn y CDLl i'w Archwilio gan y Cyhoedd. Os caiff ei ddewis, bydd y safle'n ymddangos ar y map cynigion fel dyraniad/y tu mewn i'r ffin anheddiad. Bydd hyn yn destun ymgynghoriad cyhoeddus pellach yng ngham Archwilio'r CDLl gan y Cyhoedd.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27870
Derbyniwyd: 18/09/2019
Respondent ID: 6611
Ymatebydd: Rhys Griffith
Gwrthwynebaf adeiladu ar y safle yma oherwydd yr effaith ar ein iaith a'n diwylliant; yr effaith ar ein lonydd; yr effaith ar ein cefn gwlad a'r effaith ar ein hysgolion a'r meddygfa yma.
Nodwyd. Mae safleoedd ymgeisiol fel hwn wrthi'n cael eu hasesu i weld a ydynt yn addas i'w cynnwys yn y CDLl i'w Archwilio gan y Cyhoedd. Os caiff ei ddewis, bydd y safle'n ymddangos ar y map cynigion fel dyraniad/y tu mewn i'r ffin anheddiad. Bydd hyn yn destun ymgynghoriad cyhoeddus pellach yng ngham Archwilio'r CDLl gan y Cyhoedd.
Gwrthwynebu
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27871
Derbyniwyd: 18/09/2019
Respondent ID: 6428
Ymatebydd: mrs janet brennan
This would place a massive burden on the local infrastructure. Doctors, schools, sewage. Llanelian/dolwen road cannot cope with the amount of traffic this development would generate. I have concerns about the impact on the properties to the north due to the risk of flooding as there would be less land to absorb rainfall.
Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.
Cefnogi
Cofrestr o Safleoedd Ymgeisiol
ID sylw: 27949
Derbyniwyd: 20/09/2019
Respondent ID: 131
Ymatebydd: Cadnant Planning
This site should be included as the Strategic Site for Old Colwyn. It is a logical extension to the settlement between residential use and existing employment. The employment uses can be reconfigured and also used as a natural boundary for this settlement.
Not accepted. Site 162 is less sustainable in terms of proximity to local amenities and traffic impact on the five-ways roundabout. By comparison, strategic site 3 has better links to local amenities and bus services, presents an alternative opportunity for traffic flows east bound and consists of a rounding off/settlement extension rather than ribbon-type development.