90 Tir ger Dolwen Road, Hen Golwyn

Yn dangos sylwadau a ffurflenni 1 i 9 o 9

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27554

Derbyniwyd: 31/08/2019

Respondent ID: 6401

Ymatebydd: Mr Doug Scott

Crynodeb o'r Gynrychiolaeth:

No building should be permitted in this area as the few existing roads serving this area are already saturated due to building which has taken place. Doctors surgeries are also oversubscribed.


Ein hymateb:

Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27618

Derbyniwyd: 05/09/2019

Respondent ID: 6434

Ymatebydd: Mr Huw Owen

Crynodeb o'r Gynrychiolaeth:

Area already over developed. Increased volume of traffic from Bryn Y Mor is already noticeable. Local services can not cope with additional population.


Ein hymateb:

Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27725

Derbyniwyd: 16/09/2019

Respondent ID: 6554

Ymatebydd: Miss Jo Hughes

Crynodeb o'r Gynrychiolaeth:

The development would

Increase traffic on Llanelian Rd and Dolwen Rd these roads are too narrow with a limited pavement along Dolwen Rd. There is insufficient parking at Colwyn Bay football ground and during home games football supporters park on both sides of the road reducing this to a single line of traffic.

Place a burden on services, schools are facing funding cuts and Betsi Cadwaladr is struggling to recruit GPs to area.

Increase traffic on the marine roundabout

Impact local wildlife - hedge rows and green open spaces.


Ein hymateb:

Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27772

Derbyniwyd: 17/09/2019

Respondent ID: 6552

Ymatebydd: Mrs June Ryan

Crynodeb o'r Gynrychiolaeth:

The land is outside of the settlement boundary and in open countryside. There will be an adverse effect on wild life and the health and well being of the residents of Old Colwyn, with the destruction of hedgerows, trees and footpaths. There is already an acute lack of amenity space in Colwyn. The infrastructure is not in place all existing roads are unsuitable for any increase in traffic. Old Colwyn is already over developed.


Ein hymateb:

Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27804

Derbyniwyd: 18/09/2019

Respondent ID: 6574

Ymatebydd: Mr George Ryan

Crynodeb o'r Gynrychiolaeth:

Infrastructure totally inadequate.


Ein hymateb:

Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27854

Derbyniwyd: 18/09/2019

Respondent ID: 6607

Ymatebydd: Mr Eric Mawson

Crynodeb o'r Gynrychiolaeth:

Same comments as others for Old Colwyn, the village cannot cope with further development.


Ein hymateb:

Noted. Candidate sites such as this one are currently being assessed for suitability for inclusion in the Deposit LDP. If selected then the site will appear on the proposals map as an allocation/inside the settlement boundary. This will be subject to further public consultation at Deposit LDP stage.

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27858

Derbyniwyd: 18/09/2019

Respondent ID: 6606

Ymatebydd: Judith Griffith

Crynodeb o'r Gynrychiolaeth:

Gwrthwynebaf adeiladu ar y safle yma oherwydd yr effaith ar ein iaith a'n diwylliant; yr effaith ar ein lonydd; yr effaith ar ein cefn gwlad a'r effaith ar ein hysgolion a'r meddygfa yma.


Ein hymateb:

Nodwyd. Mae safleoedd ymgeisiol fel hwn wrthi'n cael eu hasesu i weld a ydynt yn addas i'w cynnwys yn y CDLl i'w Archwilio gan y Cyhoedd. Os caiff ei ddewis, bydd y safle'n ymddangos ar y map cynigion fel dyraniad/y tu mewn i'r ffin anheddiad. Bydd hyn yn destun ymgynghoriad cyhoeddus pellach yng ngham Archwilio'r CDLl gan y Cyhoedd.

Gwrthwynebu

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27868

Derbyniwyd: 18/09/2019

Respondent ID: 6611

Ymatebydd: Rhys Griffith

Crynodeb o'r Gynrychiolaeth:

Gwrthwynebaf adeiladu ar y safle yma oherwydd yr effaith ar ein iaith a'n diwylliant; yr effaith ar ein lonydd; yr effaith ar ein cefn gwlad a'r effaith ar ein hysgolion a'r meddygfa yma.


Ein hymateb:

Nodwyd. Mae safleoedd ymgeisiol fel hwn wrthi'n cael eu hasesu i weld a ydynt yn addas i'w cynnwys yn y CDLl i'w Archwilio gan y Cyhoedd. Os caiff ei ddewis, bydd y safle'n ymddangos ar y map cynigion fel dyraniad/y tu mewn i'r ffin anheddiad. Bydd hyn yn destun ymgynghoriad cyhoeddus pellach yng ngham Archwilio'r CDLl gan y Cyhoedd.

Cefnogi

Cofrestr o Safleoedd Ymgeisiol

ID sylw: 27950

Derbyniwyd: 20/09/2019

Respondent ID: 131

Ymatebydd: Cadnant Planning

Crynodeb o'r Gynrychiolaeth:

This site should be included as the Strategic Site for Old Colwyn. It is a logical extension to the settlement between residential use and existing employment. The employment uses can be reconfigured and also used as a natural boundary for this settlement.


Ein hymateb:

Not accepted. Site 90 is less sustainable in terms of proximity to local amenities and traffic impact on the five-ways roundabout. By comparison, strategic site 3 has better links to local amenities and bus services, presents an alternative opportunity for traffic flows east bound and consists of a rounding off/settlement extension rather than ribbon-type development.