Llanrhos
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28018
Derbyniwyd: 19/09/2019
Ymatebydd: A Wilson
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28019
Derbyniwyd: 19/09/2019
Ymatebydd: Mr Keith A Beckett
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28020
Derbyniwyd: 19/09/2019
Ymatebydd: Mrs Jacqueline Beckett
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28022
Derbyniwyd: 20/09/2019
Ymatebydd: Mr A J Howard
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28023
Derbyniwyd: 20/09/2019
Ymatebydd: Mrs Chrissy Howard
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28042
Derbyniwyd: 20/09/2019
Ymatebydd: Dr Gillian Connor Scholes
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28043
Derbyniwyd: 20/09/2019
Ymatebydd: Mr Alan Connor
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28044
Derbyniwyd: 20/09/2019
Ymatebydd: Mrs Bernadette Connor
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28075
Derbyniwyd: 20/09/2019
Ymatebydd: Mr & Mrs T & E Yarwood
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28077
Derbyniwyd: 20/09/2019
Ymatebydd: Miss Kay Hawkins
The development(s) will result in the loss of important green space, effectively joining Llandudno Junction, Llanrhos and Deganwy into one large conurbation. Being closely located to the A470/A55 it will encourage long-distance commuters and increased traffic volumes, noise and air pollution. Owing to its 'peripheral' location, the proposed school will also cause traffic congestion on local roads. Already overstretched local medical services will also be further pressured by development of 250 new properties. Environmentally, the existing drainage systems already struggles to cope with annual heavy rainfall and localised flooding is an issue on several of the fields earmarked for development.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28079
Derbyniwyd: 23/09/2019
Ymatebydd: Mrs Lindsey Clarke
Would adversely affect the role of the green wedge in maintaining separation of the settlements.
We believe that not all landowners have agreed to development of the site so there is doubt as to its deliverability.
As far as we are aware there does not appear to have been full and adequate assessment of suitability of the site.
No assessment of submitted candidate sites has been prepared/published.
Insufficient pupils to support provision of a new primary school.
Plans at the exhibition differed from those published in the preferred strategy.
Detrimental impact upon the setting of Maes Dolau Caravan Park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28149
Derbyniwyd: 20/09/2019
Ymatebydd: Llandudno and Colwyn Bay History Society
Llanrhos currently works as a community.
The loss of this prime farming land would have a serious impact on the viability of the farm.
The county has been almost completely de-industrialised, without jobs there will be no need for housing.
For affordable housing read token rented social housing.
Welsh Water will find it difficult to provide sewerage facilities.
The existing primary school in Deganwy is over capacity.
The only medical practice in Deganwy comprises 2 doctors with a 6,000 plus list.
The site is within a Special Landscape Area, Historic Landscape and Green Wedge.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28151
Derbyniwyd: 20/09/2019
Ymatebydd: Mr Philip Williams
I object on the grounds of:
Infrastructure and Roads - the roads are already congested.
Health Provision & Services - greater demand on our GP and dental services.
Education - how will our schools, nurseries and local college cope.
Environment - impact on wildlife & flora especially near to Mynydd Marion.
Employment - will there be enough jobs available to attract people to move into the area.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Sylw
Strategaeth a Ffefrir
ID sylw: 28202
Derbyniwyd: 30/09/2019
Ymatebydd: Natural Resources Wales
We have no comments to make regarding this site.
See attached documents.
Noted.
Cefnogi
Strategaeth a Ffefrir
ID sylw: 28213
Derbyniwyd: 20/09/2019
Ymatebydd: Beech Developments (NW) Ltd
Asiant : The Planning Consultancy
Support for the allocation of a Strategic Site at Llanrhos. However, the identified area appears to be insufficient to accommodate the envisaged 250 dwellings, consideration should, therefore, be given to extending the development area onto adjacent land in order to achieve the suggested number of dwellings and, indeed, to provide for an increased level of development in overall terms.
See attached documents.
Noted. However the site will be reduced to reflect the green wedge review recommendations for land between Llanrhos and Deganwy. Density is likely to be impacted by site layout requirements.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28240
Derbyniwyd: 17/09/2019
Ymatebydd: M J Bradley
I strongly object to the building of new houses, offices and schools. At the moment the Council is 12 millions pounds short of budget and cannot sustain the roads, sewers and amenities already in existence.
No jobs in this area now. We cannot persuade doctors to move to this area. The Health Board cannot afford staff for the hospitals and there are very few national health dentists.
I also find it hard to believe that greenfield sites are once again being targeted.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28247
Derbyniwyd: 17/09/2019
Ymatebydd: Mr & Mrs Philip & Vivien Yeomans
Just wanted to voice our opinion and objections about the proposed land development around the green wedge in the Bryn lupus road area.
We have had our holiday home based on Maes Dolau farm park now for a number of years along with my 87 year old father and love the peace and tranquillity of the park and surrounding area. What a shame it would be to build and once again take up more of our designated green wedge which is all the surrounding land around the caravan park.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28320
Derbyniwyd: 20/09/2019
Ymatebydd: Mr Richard Hatton
The green wedge needs to be conserved in its entirety in order to maintain the separate urban identities of Deganwy, Llanrhos and Llandudno.
If BP29 were followed it would disqualify the site. It recommends "the area should remain largely intact as it is already relatively narrow between large urban areas with severe pressure for development.
The projected housing demand not justified in terms of actual population and economic growth.
Insufficient/unsuitable road and footpath infrastructure.
Medical services already stretched and in decline.
Compromise of the Maes Dollau caravan park business.
Misleading inconsistent site extent.
Misleading layout and amenity content.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28321
Derbyniwyd: 20/09/2019
Ymatebydd: Mr Keith Richards
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28322
Derbyniwyd: 20/09/2019
Ymatebydd: Mr Frederick Neil Redwood
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28323
Derbyniwyd: 20/09/2019
Ymatebydd: Ms Josephine Evans
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28324
Derbyniwyd: 20/09/2019
Ymatebydd: Ms Hannah Mae McGlory
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28325
Derbyniwyd: 20/09/2019
Ymatebydd: Mr Derek Evans
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28326
Derbyniwyd: 20/09/2019
Ymatebydd: Ms Sheila Short
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28327
Derbyniwyd: 20/09/2019
Ymatebydd: Ms Barbara Lawson-Reay
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28328
Derbyniwyd: 20/09/2019
Ymatebydd: Ms Maureen Thomas
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28329
Derbyniwyd: 20/09/2019
Ymatebydd: Mrs Holly Reece
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28330
Derbyniwyd: 20/09/2019
Ymatebydd: Ms Lesley Sheppard
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28331
Derbyniwyd: 20/09/2019
Ymatebydd: GB & M Schlangen
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.
Gwrthwynebu
Strategaeth a Ffefrir
ID sylw: 28332
Derbyniwyd: 20/09/2019
Ymatebydd: Ms Hilary Williams
The site falls totally within the extensive Green Wedge Protected Area designated in 1982.
The continuation of this policy is essential.
The Green Wedge Review states that the area forms an important green countryside buffer of rural character.
There is a lack of medical services.
Council services and operations are already under pressure.
Increased traffic congestion.
Loss of agricultural land, habitat and wildlife corridors.
Prioritise brownfield sites.
Drainage and sewage disposal capacity issues.
Housing - actual requirements as opposed lifestyle choices.
Use existing powers to make unoccupied properties available.
Is the current year on year construction realistic and achievable.
See attached document.
Not accepted. The site will be reduced in area to reflect the recommendation in the Green Wedge Review.