Abergele

Yn dangos sylwadau a ffurflenni 1 i 5 o 5

Gwrthwynebu

Strategaeth a Ffefrir

ID sylw: 27427

Derbyniwyd: 05/08/2019

Ymatebydd: Mr Oliver Moore

Crynodeb o'r Gynrychiolaeth:

I am in support of this area being zoned for recreational space, retail (small units i.e. a Co Op convenience store) and a school but strongly object to the use of B1, B2 and B8 in this area. This will have a detrimental effect to the town of Abergele and the existing surrounding highway network cannot sustain such use.

Testun llawn:

I am in support of this area being zoned for recreational space, retail (small units i.e. a Co Op convenience store) and a school but strongly object to the use of B1, B2 and B8 in this area. This will have a detrimental effect to the town of Abergele and the existing surrounding highway network cannot sustain such use.


Ein hymateb:

Not accepted. The site will have better access to the A55 being located on the eastern side of town. CCBC continue to work towards resolving the town centre highway capacity issues.

Sylw

Strategaeth a Ffefrir

ID sylw: 27959

Derbyniwyd: 20/09/2019

Ymatebydd: ms Caroline Carrick

Crynodeb o'r Gynrychiolaeth:

Suggest that link road is again included through to St George Road (as per old LDP) to help to reduce traffic flow in town centre and help with sustainable travel.

Testun llawn:

Suggest that link road is again included through to St George Road (as per old LDP) to help to reduce traffic flow in town centre and help with sustainable travel.


Ein hymateb:

Noted.

Sylw

Strategaeth a Ffefrir

ID sylw: 27963

Derbyniwyd: 20/09/2019

Ymatebydd: ms Caroline Carrick

Crynodeb o'r Gynrychiolaeth:

A lot of work has gone into trying to bring this forward and collaboration with other landowners in the previous LDP with the rest of the allocation. This was discussed at meeting of landowners on 10 September at Conwy Council as was the need for the link road to continue to St George Road and a continued collaboration between landowners to make this happen to help deliver the best infrastructure for Abergele.

Testun llawn:

A lot of work has gone into trying to bring this forward and collaboration with other landowners in the previous LDP with the rest of the allocation. This was discussed at meeting of landowners on 10 September at Conwy Council as was the need for the link road to continue to St George Road and a continued collaboration between landowners to make this happen to help deliver the best infrastructure for Abergele.


Ein hymateb:

Noted.

Sylw

Strategaeth a Ffefrir

ID sylw: 28204

Derbyniwyd: 30/09/2019

Ymatebydd: Natural Resources Wales

Crynodeb o'r Gynrychiolaeth:

Part of the site is shown to be within zone C1 of the Development Advice Maps (DAM) contained TAN15: Development and Flood Risk. The flood mapping shown to impact this site allocation is based on historic flooding (1977 rather than the 1990 Towyn event).

Testun llawn:

See attached documents.

Atodiadau:


Ein hymateb:

Noted. CCBC are aware of the flood risk designation and the development layout will be designed accordingly.

Cefnogi

Strategaeth a Ffefrir

ID sylw: 28214

Derbyniwyd: 16/09/2019

Ymatebydd: Liberty Properties

Crynodeb o'r Gynrychiolaeth:

On behalf of the landowners with whom we have an agreement to promote the site, we support the Council's plans for mixed use development as outlined for Abergele South East in the Stage 5 Replacement Plan. The specific land upon which we are making representations in 5(a) and 5(b) on the attached plan.

Testun llawn:

See attached document.

Atodiadau:


Ein hymateb:

Noted.