10.4 Abergele

Showing comments and forms 1 to 5 of 5

Object

Preferred Strategy

Representation ID: 27427

Received: 05/08/2019

Respondent: Mr Oliver Moore

Representation Summary:

I am in support of this area being zoned for recreational space, retail (small units i.e. a Co Op convenience store) and a school but strongly object to the use of B1, B2 and B8 in this area. This will have a detrimental effect to the town of Abergele and the existing surrounding highway network cannot sustain such use.

Full text:

I am in support of this area being zoned for recreational space, retail (small units i.e. a Co Op convenience store) and a school but strongly object to the use of B1, B2 and B8 in this area. This will have a detrimental effect to the town of Abergele and the existing surrounding highway network cannot sustain such use.


Our response:

Not accepted. The site will have better access to the A55 being located on the eastern side of town. CCBC continue to work towards resolving the town centre highway capacity issues.

Comment

Preferred Strategy

Representation ID: 27959

Received: 20/09/2019

Respondent: ms Caroline Carrick

Representation Summary:

Suggest that link road is again included through to St George Road (as per old LDP) to help to reduce traffic flow in town centre and help with sustainable travel.

Full text:

Suggest that link road is again included through to St George Road (as per old LDP) to help to reduce traffic flow in town centre and help with sustainable travel.


Our response:

Noted.

Comment

Preferred Strategy

Representation ID: 27963

Received: 20/09/2019

Respondent: ms Caroline Carrick

Representation Summary:

A lot of work has gone into trying to bring this forward and collaboration with other landowners in the previous LDP with the rest of the allocation. This was discussed at meeting of landowners on 10 September at Conwy Council as was the need for the link road to continue to St George Road and a continued collaboration between landowners to make this happen to help deliver the best infrastructure for Abergele.

Full text:

A lot of work has gone into trying to bring this forward and collaboration with other landowners in the previous LDP with the rest of the allocation. This was discussed at meeting of landowners on 10 September at Conwy Council as was the need for the link road to continue to St George Road and a continued collaboration between landowners to make this happen to help deliver the best infrastructure for Abergele.


Our response:

Noted.

Comment

Preferred Strategy

Representation ID: 28204

Received: 30/09/2019

Respondent: Natural Resources Wales

Representation Summary:

Part of the site is shown to be within zone C1 of the Development Advice Maps (DAM) contained TAN15: Development and Flood Risk. The flood mapping shown to impact this site allocation is based on historic flooding (1977 rather than the 1990 Towyn event).

Full text:

See attached documents.

Attachments:


Our response:

Noted. CCBC are aware of the flood risk designation and the development layout will be designed accordingly.

Support

Preferred Strategy

Representation ID: 28214

Received: 16/09/2019

Respondent: Liberty Properties

Representation Summary:

On behalf of the landowners with whom we have an agreement to promote the site, we support the Council's plans for mixed use development as outlined for Abergele South East in the Stage 5 Replacement Plan. The specific land upon which we are making representations in 5(a) and 5(b) on the attached plan.

Full text:

See attached document.

Attachments:


Our response:

Noted.