Object

Preferred Strategy

Representation ID: 29207

Received: 20/09/2019

Respondent: Mrs L Roberts

Representation Summary:

This is too many houses for the village, it would change the village into a commuter town.
Also the proposed housing development would put additional pressure on existing resources.
No consultation was made with the village people prior to putting this plan forward, as there are many large empty buildings in Llanfairfechan that should be refurbished rather than built new e.g. The Heath, The old co-operative shop etc.
200 homes would be more than enough.

Full text:

See attached document.

Attachments:


Our response:

Not accepted. The capacity of the site has been reduced to 250 dwellings following additional constraints being identified. The dwelling requirement has been split across the Replacement LDP plan area. The West is to provide 10% of growth.
Public consultation has been in-line with the Delivery Agreement and requirements set out by Welsh Government. There will be further public consultation on the Replacement LDP in future.
An allowance for windfall sites has been included in the dwelling figures for the Replacement LDP. This includes empty buildings.