Comment

Preferred Strategy

Representation ID: 28276

Received: 02/10/2019

Respondent: R H Edwards-Behi

Representation Summary:

I support the level of forecasted jobs. It is a shame, however, that some of the jobs are not targeted for Llanfairfechan.
The new homes in Llanfairfechan should be developed/built in stages, with appropriate levels of services in place at least at the same time but preferably before the houses are built.

Full text:

See attached document.

Attachments:


Our response:

Noted. Employment land has been allocated to reflect our evidence base (see background paper 19). Existing employment sites will be safeguarded via a criteria based policy.
Residential development sites will be phased accordingly, and infrastructure requirements will be taken into account.