Comment
Preferred Strategy
Representation ID: 28276
Received: 02/10/2019
Respondent: R H Edwards-Behi
Representation Summary:
I support the level of forecasted jobs. It is a shame, however, that some of the jobs are not targeted for Llanfairfechan.
The new homes in Llanfairfechan should be developed/built in stages, with appropriate levels of services in place at least at the same time but preferably before the houses are built.
Full text:
See attached document.
Our response:
Noted. Employment land has been allocated to reflect our evidence base (see background paper 19). Existing employment sites will be safeguarded via a criteria based policy.
Residential development sites will be phased accordingly, and infrastructure requirements will be taken into account.