Comment

Preferred Strategy

Representation ID: 28204

Received: 30/09/2019

Respondent: Natural Resources Wales

Representation Summary:

Part of the site is shown to be within zone C1 of the Development Advice Maps (DAM) contained TAN15: Development and Flood Risk. The flood mapping shown to impact this site allocation is based on historic flooding (1977 rather than the 1990 Towyn event).

Full text:

See attached documents.

Attachments:


Our response:

Noted. CCBC are aware of the flood risk designation and the development layout will be designed accordingly.