Comment
Preferred Strategy
Representation ID: 28204
Received: 30/09/2019
Respondent: Natural Resources Wales
Representation Summary:
Part of the site is shown to be within zone C1 of the Development Advice Maps (DAM) contained TAN15: Development and Flood Risk. The flood mapping shown to impact this site allocation is based on historic flooding (1977 rather than the 1990 Towyn event).
Full text:
See attached documents.
Our response:
Noted. CCBC are aware of the flood risk designation and the development layout will be designed accordingly.