Comment

Preferred Strategy

Representation ID: 28179

Received: 30/09/2019

Respondent: Natural Resources Wales

Representation Summary:

Flood risk is a significant issue for CCBC and the RLDP and there is no strategic objective (SO) below the vision itself to tackle this issue at the strategic planning scale. Ideally the SO objectives should form a smaller set of objectives. The revision or addition of an SO within the RLDP will require the refinement of the wording in the SA objective. There is an absence of local flood risk evidence within the baseline.

Full text:

See attached documents.

Attachments:


Our response:

Noted: This will be covered in the RLDP.